The plan as of 20th June 2010

The plan as of  20th June 2010

Thursday 27 May 2010

The construction - 26th May 2010



The entrance to our canal tunnel, it goes through the West Hill and emerges the other side into a once busy industrial basin.



The base for our viaduct can be seen curving over the canal and undulating ground, formed from carving high density foam. Good fun but messy!



The start of the fiddle yard, a lot for just one brake van!





The construction - 31st March 2010




Copper pcb strips glued in place along the board joints




The dock side



The track is laid lower than ground level, as this area is going to be concreted/cobbled over, just exposing the track. We were able to use up some old code 80 track and points in this area.


More track going down. this time code 55.


The construction - 11th and 24th March 2010


Bending thin ply wood to create a retaining wall



Ruffing out where the points are going, not necessarily where they are on the plan!



"Underneath the Arches" not the song of the duo Flanagan and Allen