The layout finally was up and running with 10 minutes to spare before the show was opened.
Maybe the fiddle yard is to short.....
....it didn't matter how much we looked at it it wasn't getting any longer.
The layout was controlled via two double cabs ( only using three cabs ) at the rear on a shelf, which came in handy for coffee cups and tools, and one on the dock side. This arrangement was just thrown together for our show. We are hoping for DDC to operate the trains.
All passing each other without any/to many crashes.
The are arches looking busy and there not even finished yet.
No comments:
Post a Comment